EXPLANATORY VIDEO AT THE END OF THIS PAGE
After planning, it may be necessary to remove a work order from it. This may occur due to the location of one OS being very far from the previous one, which would result in a lot of travel time and less productivity. Therefore, there are 2 simple ways to perform this action.
Follow the steps:
1 - When you want to remove only one OS from planning
Actions (left sidebar) --> Dispatch - New (will be directed to the Timeline) --> right-click on the OS -- > Options (top right corner) --> Remove from Planning
2 - When you want to remove more than one OS, at the same time, from planning
Actions (left sidebar) --> Dispatch - New (will be directed to the Timeline) --> right-click on the desired team --> Manage OS --> select orders --> Remove from Planning (bottom corner right) --> Yes (confirmation)
WATCH THE VIDEO WITH MORE DETAILS ON THE TOPIC
Comments
0 comments
Please sign in to leave a comment.